Building change of use from office block to luxury apartments in Clapham, London.
Approximately 1,800m² of internal refurbishment.
Challenging design due to spatial constraints within each apartment for M&E services
Each apartment features a high efficiency ventilation system with heat recovery, underfloor heating and LED lighting.
Other facilities include integrated modern sound system facility, access control feature for the access entrances to site and sprinkler systems where required.