Full refurbishment of a 1,290m2 purpose-built office over two floors, including a new double-height feature entrance in the heart of Guildford.
Energy-enhancing systems installed including new LED lighting throughout, a large photovoltaic array on the roof and multiple electric vehicle charging units.
Validation and overhaul to the existing air-conditioning and fresh-air mechanical systems throughout all areas of the building.
Bespoke lighting arrangement for the new double-height feature atrium and refurbished core circulation spaces using plaster-in linear LED luminaires.
New security systems installed throughout the building including a full colour CCTV scheme covering internal and external aspects of the building and a new sophisticated access control system on the main entrance door.