Posts by admin
Bournemouth & Poole College – ASDM
£9m construction of a high quality teaching facility Approximately 5,000m² floor area spanning over three floors Consisting of general teaching spaces, science laboratories, music rooms and a theatre 249m² Photovoltaic installation to the roof Sophisticated natural ventilation system High efficiency HVAC systems LED lighting throughout with extensive use of intelligent lighting controls including DALI dimming…
Read MoreBrighton Marina Yacht Club
New Yacht Club on a floating construction within Brighton Marina The Yacht Club features a commercial kitchen, bar, restaurant area, office, beer cellar, toilet facilities and storage areas, as well as an external terrace area The building is heated via a combination of low surface temperature and column style radiators served from a high efficiency…
Read MoreChichester Business Park, Plots 1-5
Design and coordination of the site infrastructure and utility services for Phase 1 and Phase 2 of the Plots 1-5 development at Chichester Business Park. Phase 1 consists of 9no new industrial units and Phase 2 consists of 5no new industrial units. External lighting design scheme for the site, whilst demonstrating compliance with the Environmental…
Read MoreChithurst Monastery, Petersfield
This is the construction of a purpose-made utility building, incorporating ablutions and quiet meditation space as a standalone building, within the grounds of an established Buddhist Monastery. A high-quality, low-energy building, constructed of a traditional heavy hand-crafted oak frame. Robust energy-efficient heating system utilising an existing and established wood-fired heat source in conjunction with underfloor…
Read MoreCornhill, London
High quality office space refurbishment in busy area of London Installation of new ventilation and heating & cooling systems BMS integration Over 90% of the buildings energy/water usage accounted for through metering Complete LV electrical distribution replacement New LED lighting systems with intelligent controls BREEAM achieved ‘very good’
Read MoreCothey Way, Ryde, Isle of Wight
Refurbishment of a 2000m2 ground floor manufacturing and testing facility including large open plan offices on the Isle of Wight for Pascall Electronics Ltd. The refurbishment was carried out during full occupation of the building Refurbishment of a 2000m2 ground floor manufacturing and testing facility The project was broken down into five phases to ensure…
Read MoreDurley Chine Restaurant, Bournemouth
Feature Café/occasional venue on the promenade of Bournemouth sea front Incorporated public toilet facilities and council office Separation of building services between Café and council facilities Mechanical design carried out using latest Revit MEP 3D modelling software Full 3D co-ordination with architectural and structural disciplines High efficiency heat recovery ventilation with high efficiency heating and…
Read MoreEmsworth Surgery
Full refurbishment of Victorian cottage hospital and conversion to 21st Century Doctors’ Practice, over three floors Energy-efficient space heating by modulating gas-fired boilers and low surface temperature radiators Clinical spaces heated and cooled by energy-efficient heat pumps Controlled mechanical ventilation with heat recovery to requisite areas Energy-efficient, automatically controlled LED lighting throughout HTM-compliant, pressure-boosted domestic…
Read MoreFront Lawn Recreation Ground, Havant
One example of a current project local to the Portsmouth area is Front Lawn Recreation Ground. This is a community sports project on the Front Lawn Recreational Site, Havant. Valued in excess of £1M, this community project involves local government, national sporting associations, non-league local football and tennis clubs in the construction of a new…
Read MoreGoddards Brewery, Isle of Wight
New 1200m2 brewery located in in Branstone on the Isle of Wight The new building provides a large brewing area, visitors centre, shop, staff offices, and a restaurant for up to 90 covers Bespoke high-efficiency LED lighting within the visitor centre and restaurant Full air-conditioning building utilising reverse cycle VRF heat pump technology Mechanical ventilation…
Read More