Portsmouth Grammar School – Science Centre

New 2800m2 science centre with 13 labs and prep rooms, and 120 person lecture theatre Three floor construction with underfloor heating and atrium with motorized glass skylights Acoustic supply and extract system to laboratories and separate AHU for lecture theatre Air conditioning in staff and heads’ offices and dedicated extraction to fume cupboards Lighting management…

Read More

Portsmouth Grammar School – Sixth Form Centre

New 1600m2 Sixth Form Centre in the heart of the Portsmouth Grammar School site Achieved BREEAM ‘very good’ rating Full integrated building management system (BMS) Large social area with café and exhibition areas, extensive learning resources zone, meeting rooms, staff offices and multiple teaching spaces over three floors Glass link bridge to the existing Cambridge…

Read More

Portsmouth Historic Dockyard – Cell Block

Conversion of Victorian Naval Cell Block into starter office units for the University of Portsmouth Sensitive treatment of retained ventilation features Provision of a modern energy efficient gas-fired heating system with contemporary radiators Bespoke cable containment and lighting systems designed to English Heritage approval Historic features of the Cell Block retained and incorporated into the…

Read More

Priory School, Hitchin – New Sixth Form Building

10kWp Photovoltaic Solar panel array installed to the roof Full heat recovery VRF air source heat pumps throughout the building High-efficiency central air-handling unit Single classroom high-efficiency heat recovery ventilation systems for optimum controllability and energy efficiency LED lighting installed throughout with automatic controls where suitable Lighting DALI dimming controls installed to provide classroom flexibility…

Read More

QA Hospital, Portsmouth – Endoscopy Recovery Suite

Development of additional recovery space to the Endoscopy Department Reform of existing recovery space as well as the introduction of new WC and utility facilities Careful phasing and sequencing of the works to enable continued operation of the ward Reuse of existing mechanical and electrical services where possible New LED lighting, controls and smart wireless…

Read More

Richard Collyer’s College, Horsham – The Shelley Building

EPC ‘A’ rating 11kWp Photovoltaic Solar panel array installed to the roof Full heat recovery VRF air source heat pumps throughout the building Single classroom high-efficiency heat recovery ventilation systems for optimum controllability and energy-efficiency Air source heat pump system for hot water generation Intelligent hot water generation plant optimises performance by looking at trends…

Read More

Rochester Trade Park

Complete replacement of M&E services including HVAC, LED lighting and domestic water services. High quality fit-out completed to a high standard, including coordination with specialist equipment such as fume extraction for the incoming tenants. Highly efficient LED lighting installed throughout. Central heat recovery ventilation system with EC motors. Mitsubishi Electric VRF air source heat pumps…

Read More

Sovereign Harbour Medical Centre, Eastbourne

New build £1.6 million medical centre on the Eastbourne coast. Built on two floors consisting of nine consulting rooms, three treatment rooms, administration and staff offices, large waiting and sub-waiting areas, and a minor operations area, including surgical theatre and recovery rooms The circulation areas featured under-floor heating, while the occupied rooms had space heating…

Read More

Spitbank Fort, Solent

Three floor 50m diameter island property without main service utilities connections Conversion of an iconic scheduled Ancient Monument into a luxury escape and corporate venue Inaccessible other than by sea – Months of design co-ordination – Site visits – Surveys – Planning Careful installation planning to conserve the existing building features Multiple generator distribution, with…

Read More