Refurbishment of the ground floor reception, toilet facilities, and Category A fit outs to multiple office floors within an occupied building, undertaken over several phases
Bespoke LED lighting design integrated within a unique concept ceiling arrangement
Concealed vertical fan coil units coordinated within new false wall joinery system
Modular office lighting design utilising LED panels integrated within a new SAS ceiling
Full lighting control system design incorporating daylight dimming control
Refurbishment of the toilets on all floors including new LED lighting, controls, and fire alarm devices
Modification of the existing four-pipe fan coil unit system to provide a uniform Category A layout
New access control system provided throughout the building