Hermitage Court, Maidstone

  • Re-development of ground-floor office space into a Community Diagnostics Centre, including X-ray machines and lung function testing facilities.
  • Challenging ceiling void coordination with very limited space.
  • Large fully HTM compliant Air-Handling Unit used in conjunction with a VRV air source heat pump heating and cooling system.
  • New high-efficiency LED lighting with automatic controls.
  • Addressable fire damper system as well as nurse call, panic buttons and access control.
  • Consideration to the first-floor services/operation and requirements to maintain segregation.
  • Pressure stabilisation dampers for areas that need to maintain a consistent negative pressure differential.
  • Challenging above ground drainage design with a lack of existing connections to below ground. The floor void was used in conjunction with drainage pumps to enable a network of pipework to be distributed around the floor onto main drainage stacks. All controlled via a central control panel.
  • Comprehensive Building Management System with energy metering integration.
  • Complete LV distribution replacement.
  • New Wi-Fi, CCTV and intruder alarm.