Montague Park Infant & Primary School is a new build school in Wokingham set with a BREEAM “Very Good” rating
Total floor area of 3300m2 over two floors
Building fully controlled via efficient Building Management System (BMS)
Space heating provided via multiple high COP air source heat pumps distributed through underfloor heating manifolds
Ventilation provided via motorized louvres and windows operating a natural passive stack system discharging at high level through the atrium glass roof, to comply with Building Bulletin 101
Internal and external lighting designed primarily using LED lamps, including the new 4G sports pitch and multi use games area (MUGA Court)
12.5kW 50 Panel PV system installed on the roof for onsite electrical generation
Design of the incoming mains panel, mains distribution and local small power to meet the end users’ needs
Full coordinated design with the sprinkler installation