Health
Andover Community Diagnostic Centre (ACDC)
Redevelopment of five existing areas within a live hospital environment. A new ultrasound department featuring 8 endoscopy scanning rooms, staff offices, waiting rooms, phlebotomy and vaccination rooms. A new endoscopy theatre and consultation room. A new minor injuries unit featuring consultation rooms, clean and dirty utilities, plaster room, reception and staff offices. A new sexual…
Read MoreBerrywood NHS Ambulance Data Centre, Southampton
Upgrading and refurbishment of data centre electrical supplies including standby and final equipment connection services Results of work done 2.5 times data connection capacity Continuity of existing services during refurbishment Improved air conditioning for data and staff areas Multi phase connection capability Improved fire protection coverage Completion to plan Main Features SCAS NHS client Client…
Read MoreEmsworth Surgery
Full refurbishment of Victorian cottage hospital and conversion to 21st Century Doctors’ Practice, over three floors Energy-efficient space heating by modulating gas-fired boilers and low surface temperature radiators Clinical spaces heated and cooled by energy-efficient heat pumps Controlled mechanical ventilation with heat recovery to requisite areas Energy-efficient, automatically controlled LED lighting throughout HTM-compliant, pressure-boosted domestic…
Read MoreHermitage Court, Maidstone
Re-development of ground-floor office space into a Community Diagnostics Centre, including X-ray machines and lung function testing facilities. Challenging ceiling void coordination with very limited space. Large fully HTM compliant Air-Handling Unit used in conjunction with a VRV air source heat pump heating and cooling system. New high-efficiency LED lighting with automatic controls. Addressable fire…
Read MoreQA Hospital, Portsmouth – Endoscopy Recovery Suite
Development of additional recovery space to the Endoscopy Department Reform of existing recovery space as well as the introduction of new WC and utility facilities Careful phasing and sequencing of the works to enable continued operation of the ward Reuse of existing mechanical and electrical services where possible New LED lighting, controls and smart wireless…
Read MoreQA Hospital, Portsmouth – Frailty Intervention Team Department (FIT)
Complete overhaul of existing office spaces Developed into ‘recovery’ spaces for the Frail Reuse of existing mechanical and electrical services where possible New LED lighting, controls and smart wireless emergency lighting technology Integration into hospitals site-wide BMS
Read MoreSovereign Harbour Medical Centre, Eastbourne
New build £1.6 million medical centre on the Eastbourne coast. Built on two floors consisting of nine consulting rooms, three treatment rooms, administration and staff offices, large waiting and sub-waiting areas, and a minor operations area, including surgical theatre and recovery rooms The circulation areas featured under-floor heating, while the occupied rooms had space heating…
Read More