Industrial
Chichester Business Park, Plots 1-5
Design and coordination of the site infrastructure and utility services for Phase 1 and Phase 2 of the Plots 1-5 development at Chichester Business Park. Phase 1 consists of 9no new industrial units and Phase 2 consists of 5no new industrial units. External lighting design scheme for the site, whilst demonstrating compliance with the Environmental…
Read MoreCothey Way, Ryde, Isle of Wight
Refurbishment of a 2000m2 ground floor manufacturing and testing facility including large open plan offices on the Isle of Wight for Pascall Electronics Ltd. The refurbishment was carried out during full occupation of the building Refurbishment of a 2000m2 ground floor manufacturing and testing facility The project was broken down into five phases to ensure…
Read MoreHQube, Theale
A refurbishment of a large 4 storey industrial facility with office spaces. The proposal was to reuse as much as possible of the existing services infrastructure and main equipment plant, but also involved replacement of certain elements including the main warehouse floor AHUs and the lighting throughout. The warehouse was stripped down to an open…
Read MoreMatrix Park, Fareham
Refurbishment of existing warehouse to a value of over £500,000 Close temperature control solutions for the stored goods including refrigerant-based VRV system, de-stratification fans, air curtains and temperature monitoring system High quality mechanical and electrical services fit-out including LED lighting, closely coordinated with high-standing storage racking
Read MoreRochester Trade Park
Complete replacement of M&E services including HVAC, LED lighting and domestic water services. High quality fit-out completed to a high standard, including coordination with specialist equipment such as fume extraction for the incoming tenants. Highly efficient LED lighting installed throughout. Central heat recovery ventilation system with EC motors. Mitsubishi Electric VRF air source heat pumps…
Read MoreSt James Industrial Estate, Chichester
Design and coordination of the site infrastructure and utility services for the 21no new industrial units, including 1no large unit approximately 2,350m2. External lighting design scheme for the site, whilst demonstrating compliance with the Environmental policies required as part of the planning conditions. Coordination of the new on-site electrical substation. SBEM BRUKL calculations undertaken for…
Read MoreStroudley Road, Basingstoke
Conversion of a shell & core 4000m2 warehouse and mezzanine offices for Winkworth Mixers New Powermatic heaters to provide rapid response heating within the large warehouse area Specialist ventilation design for spray booths and welding machines Intricate design of the electrical mains distribution and final outlets coordinated with the structural engineer and end user Coordination…
Read More